Last updated: November 24, 2026
Usually, yes. If your office, clinic or shop closes between Christmas and New Year's, that week is often enough time to paint it. There's nobody to work around, and the space has a few days to air out before people come back. The catch is that everything else has to be settled first: the walkthrough, the written quote, any approvals and your colors. With Christmas about a month out, now is the time to start.

How many working days does a holiday closure give you?
Fewer than it feels like. This year Christmas and New Year's Day both land on a Friday. A business that closes from Christmas Eve through New Year's weekend has four weekdays in between, Monday, December 28 through Thursday, December 31, plus the two Saturdays. We work Monday through Saturday, 7 AM to 8 PM, and we're closed Sundays.
That's usually enough for a lobby, a hallway, a break room or a handful of private offices. A whole floor may not fit. Do the rooms people see first during the closure, and paint the rest around your normal hours in January. Our post on painting an office without closing explains how that part works.
What has to be done before the closure starts?
- A walkthrough. We walk the space with you and note what's being painted: walls, ceilings, doors and frames, trim. Bring your exact closed dates.
- A written quote. It lists the scope room by room. If an owner, a board or a property manager has to sign off, leave time for that.
- Colors. Pick them before the closure. A color decision still open on December 28 costs you a day you don't have.
- Paint on hand. Many stores close or shorten hours on Christmas Eve and New Year's Eve, so the paint should be on site before day one.
- Access. Who has keys or door codes, how the alarm works, and which entrance to use.
- Desks and shelves. Have people clear their desktops and walls before they leave for the holiday. Anything that can't be moved, tell us, and it gets covered.
Keep the heat on
Many buildings turn the heat way down while they're closed, and in an Iowa winter that's a problem. Paint needs warmth to go on and dry right. Sherwin-Williams says to apply ProMar 200 Zero VOC, a common office wall paint, above 50°F. Its dry and recoat times (dry to the touch in an hour, ready for a second coat in four) are measured at 77°F (Sherwin-Williams product data sheet, April 2026). A cold room means slower drying and a tighter schedule. Leave the heat at your normal daytime setting in the rooms being painted, and tell whoever manages the building's heat before you close.
Will it smell like paint when we reopen?
Not if you leave time for it. EPA says most paint fumes come off while the paint dries, in the first few days. It recommends running fans and as much ventilation as possible from the start of painting until 2 or 3 days after it's done (EPA). In a Central Iowa winter the windows stay shut, so the building's ventilation does that work. Ask whoever manages the building's heating to keep the system moving fresh air while the work is going on. Then plan backward from the morning you reopen: the last coat goes on two or three days before people return. For a Monday, January 4 reopening, plan to finish by Thursday, December 31.

Which businesses is this a good fit for?
- Offices and professional suites that close for the week or keep only a few people in the building.
- Dental and medical clinics that already close a few days around the holidays and can't have paint smell during patient hours.
- Shops, showrooms and service counters where customers would otherwise walk past wet walls.
Churches are the exception. Christmas is their busiest week of the year, so January or February is usually a better time to paint a sanctuary or fellowship hall.
Frequently asked questions
Can you paint our office while we're closed for the holidays?
Often, yes. A closure means empty rooms and nobody to work around. Call early so the walkthrough, quote and colors are settled before your closed dates.
How much can get painted in one holiday week?
It depends on the space. A lobby, hallways, a break room or a few private offices usually fit. A whole floor may not, and the rest can be painted around your hours in January.
Do we need to keep the heat on?
Yes. Leave the rooms being painted at your normal daytime temperature. Sherwin-Williams' ProMar 200, a common office paint, is made to go on above 50°F, and paint dries more slowly when it's cold.
Will it smell like paint when we reopen?
Plan the last coat two or three days before people come back and keep the ventilation running. EPA recommends ventilating until 2 or 3 days after painting is done.
What days do you work?
Monday through Saturday, 7 AM to 8 PM. We're closed Sundays.
Want it done while you're closed?
Mission Painting is a family-owned company based in Ankeny, owned by Tyler and Tammy Rodgers. We paint offices, clinics and shops across Central Iowa, from West Des Moines to Ankeny. We're Licensed & insured, our Iowa contractor registration is C151929, and commercial work is covered by our 1-year workmanship warranty. See our commercial painting page and the West Des Moines office job, then call 515-635-1177 or request a free quote and tell us your closed dates.
Sources: EPA, Addressing Indoor Environmental Concerns During Remodeling · Sherwin-Williams, ProMar 200 Zero VOC Interior Latex Eg-Shel product data sheet (04/2026)